Projects per year
Abstract
We present velocity-resolved reverberation results for five active galactic nuclei. We recovered velocity-delay maps using the maximum entropy method for four objects: Mrk 335, Mrk 1501, 3C 120, and PG 2130+099. For the fifth, Mrk 6, we were only able to measure mean time delays in different velocity bins of the H beta emission line. The four velocity-delay maps show unique dynamical signatures for each object. For 3C 120, the Balmer lines show kinematic signatures consistent with both an inclined disk and infalling gas, but the He II lambda 4686 emission line is suggestive only of inflow. The Balmer lines in Mrk 335, Mrk 1501, and PG 2130+099 show signs of infalling gas, but the He II emission in Mrk 335 is consistent with an inclined disk. We also see tentative evidence of combined virial motion and infalling gas from the velocity-binned analysis of Mrk 6. The maps for 3C 120 and Mrk 335 are two of the most clearly defined velocity-delay maps to date. These maps constitute a large increase in the number of objects for which we have resolved velocity-delay maps and provide evidence supporting the reliability of reverberation-based black hole mass measurements.
Original language | English |
---|---|
Article number | 47 |
Number of pages | 15 |
Journal | Astrophysical Journal |
Volume | 764 |
Issue number | 1 |
DOIs | |
Publication status | Published - 10 Feb 2013 |
Keywords
- GEOMETRY
- galaxies: active
- STEPS
- galaxies: Seyfert
- QUASAR VARIABILITY
- NGC-5548
- SEYFERT-GALAXIES
- galaxies: nuclei
- PROFILE VARIATIONS
- SIZE
- MASS
- EMISSION
- BLACK-HOLE
Fingerprint
Dive into the research topics of 'The structure of the broad-line region in active galactic nuclei. I. Reconstructed velocity-delay maps'. Together they form a unique fingerprint.Projects
- 2 Finished
-
AGN Echo mapping: AGN Echo Mapping and Mineral Clouds in Alien Atmospheres
Horne, K. D. (PI)
Science & Technology Facilities Council
1/04/12 → 31/08/12
Project: Standard
-
Astrophysics at St Andrews:2012 - 2014: Astrophysics at St Andrews: 2012 - 2014
Horne, K. D. (PI)
Science & Technology Facilities Council
1/10/11 → 31/03/12
Project: Standard