Projects per year
Abstract
We introduce a novel and exciting research area: symmetrising levels of consistency to produce stronger forms of consistency and more efficient mechanisms for establishing them. We propose new levels of consistency for Constraint Satisfaction Problems (CSPs) incorporating the symmetry group of a CSP. We first define Sym(i, j) -consistency, show that even Sym(1,0)-consistency can prune usefully, and study some consequences of maintaining Sym(i, 0)consistency. We then present pseudocode for SymPath consistency, and a symmetrised version of singleton consistency, before presenting experimental evidence of these algorithms' practical effectiveness. With this contribution we establish the study of symmetry-based levels of consistency of CSPs.
Original language | English |
---|---|
Title of host publication | Principles and Practice of Constraint Programming - CP 2005 |
Subtitle of host publication | Proceedings of the 11th International Conference, CP 2005, Sitges, Spain, October 1-5, 2005 |
Editors | Peter van Beek |
Publisher | Springer-Verlag |
Pages | 271-285 |
Number of pages | 15 |
ISBN (Electronic) | 978-3-540-29238-8 |
DOIs | |
Publication status | Published - 2005 |
Event | Principles and Practice of Constraint Programming - CP 2005 - Sitge, Spain Duration: 1 Oct 2005 → 5 Oct 2005 |
Publication series
Name | Lecture Notes in Computer Science |
---|---|
Volume | 3709 |
ISSN (Print) | 0302-9743 |
ISSN (Electronic) | 1611-3349 |
Conference
Conference | Principles and Practice of Constraint Programming - CP 2005 |
---|---|
Country/Territory | Spain |
City | Sitge |
Period | 1/10/05 → 5/10/05 |
Keywords
- SUFFICIENT CONDITION
- SEARCH
Fingerprint
Dive into the research topics of 'Symmetry and consistency'. Together they form a unique fingerprint.Projects
- 1 Finished
-
EP/C523229/1: Multidisciplinary Critical Mass in Computational Algebra and Applications
Linton, S. A. (PI), Gent, I. P. (CoI), Leonhardt, U. (CoI), Mackenzie, A. (CoI), Miguel, I. J. (CoI), Quick, M. (CoI) & Ruskuc, N. (CoI)
1/09/05 → 31/08/10
Project: Standard