Projects per year
Abstract
We present a functional renormalization-group calculation of the properties of a quantum critical metal in d=2 spatial dimensions. Our theory describes a general class of Pomeranchuk instabilities with Nb flavors of boson. At small Nb we find a family of fixed points characterized by weakly non-Fermi-liquid behavior of the conduction electrons and z≈2 critical dynamics for the order-parameter fluctuations, in agreement with the scaling observed by Schattner et al. [Phys. Rev. X 6, 031028 (2016)] for the Ising-nematic transition. Contrary to recent suggestions that this represents an intermediate regime en route to the scaling limit, our calculation suggests that this behavior may persist all the way to the critical point. As the number of bosons Nb is increased, the model's fixed-point properties cross over to z≈1 scaling and non-Fermi-liquid behavior similar to that obtained by Fitzpatrick et al. [Phys. Rev. B 88, 125116 (2013)].
Original language | English |
---|---|
Article number | 201113(R) |
Pages (from-to) | 1-5 |
Number of pages | 5 |
Journal | Physical Review. B, Condensed matter and materials physics |
Volume | 98 |
Issue number | 20 |
DOIs | |
Publication status | Published - 27 Nov 2018 |
Fingerprint
Dive into the research topics of 'Non-Fermi liquid fixed points and anomalous Landau damping in a quantum critical metal'. Together they form a unique fingerprint.Projects
- 3 Finished
-
Controlling Emergent Orders in Quantum: Controlling Emergent Orders in Quantum Materials
Wahl, P. (PI), Hooley, C. (CoI) & Lee, S. (CoI)
1/06/18 → 30/06/23
Project: Standard
-
CM DTC 2014 - 2022: EPSRC centre for doctoral training in condensed matter physics: Renewal of the CM-DTC
King, P. (PI)
1/08/14 → 31/01/24
Project: Standard
-
Topological Protection and NonEquilibriu: Topological Protection and NonEquilibrium States in Strongly Correlated Electron Systems
Wahl, P. (PI), Baumberger, F. (CoI), Davis, J. C. (CoI), Green, A. (CoI), Hooley, C. (CoI), Keeling, J. M. J. (CoI) & Mackenzie, A. (CoI)
1/09/11 → 31/08/17
Project: Standard