Projects per year
Abstract
We investigate the tidal interactions between hot Jupiter extra-solar planets and their host stars in an effort to characterise the effects of such interactions On stellar rotation. We study the WASP-18 and WASP-19 systems, showing that in both cases tidal interactions cause the eventual spiral in of the the planet towards the Roche limit. We find that for both systems this process will cause significant spin up of the host star, independent of the precise value for the tidal quality factors. By fitting tidal evolution models to observed parameters, we are able to determine that WASP-19 b is currently spiralling in, and that it has a very short remaining lifetime similar to 3 Myr.
Original language | English |
---|---|
Title of host publication | ASTROPHYSICS OF PLANETARY SYSTEMS: FORMATION, STRUCTURE, AND DYNAMICAL EVOLUTION |
Editors | A Sozzetti, MG Lattanzi, AP Boss |
Publisher | Cambridge University Press |
Pages | 267-270 |
Number of pages | 4 |
ISBN (Print) | 978-0-521-19652-9 |
DOIs | |
Publication status | Published - 2011 |
Event | 276th Symposium of the International-Astronomical-Union on Astrophysics of Planetary Systems: Formation, Structure, and Dynamical Evolution - Torino, Italy Duration: 10 Oct 2010 → 15 Oct 2010 |
Publication series
Name | IAU Symposium Proceedings Series |
---|---|
Publisher | CAMBRIDGE UNIV PRESS |
Volume | 276 |
ISSN (Print) | 1743-9213 |
Conference
Conference | 276th Symposium of the International-Astronomical-Union on Astrophysics of Planetary Systems: Formation, Structure, and Dynamical Evolution |
---|---|
Country/Territory | Italy |
Period | 10/10/10 → 15/10/10 |
Keywords
- stars: rotation
- stars: activity
- planetary systems
- EVOLUTION
- GYROCHRONOLOGY
Fingerprint
Dive into the research topics of 'Do falling planets cause stellar spin-up?'. Together they form a unique fingerprint.Projects
- 1 Finished
-
Wide Area Search for Planets: Project support for the Wide Area Search for Planets
Cameron, A. C. (PI)
Science & Technology Facilities Council
1/08/08 → 31/07/11
Project: Standard