Projects per year
Abstract
We outline a method for fitting binary-lens caustic-crossing microlensing events based on the alternative model parametrization proposed and detailed by Cassan. As an illustration of our methodology, we present an analysis of OGLE-2007-BLG-472, a double-peaked Galactic microlensing event with a source crossing the whole caustic structure in less than three days. In order to identify all possible models we conduct an extensive search of the parameter space, followed by a refinement of the parameters with a Markov Chain Monte Carlo algorithm. We find a number of low-chi(2) regions in the parameter space, which lead to several distinct competitive best models. We examine the parameters for each of them, and estimate their physical properties. We find that our fitting strategy locates several minima that are difficult to find with other modelling strategies and is therefore a more appropriate method to fit this type of event.
Original language | English |
---|---|
Pages (from-to) | 787-796 |
Number of pages | 10 |
Journal | Monthly Notices of the Royal Astronomical Society |
Volume | 395 |
Issue number | 2 |
DOIs | |
Publication status | Published - 11 May 2009 |
Keywords
- gravitational lensing
- methods: miscellaneous
- binaries: general
- planetary systems
- Galaxy: bulge
- INITIAL MASS FUNCTION
- GRAVITATIONAL LENS
- GALACTIC BULGE
- STARS
- LUMINOSITY
Fingerprint
Dive into the research topics of 'A systematic fitting scheme for caustic-crossing microlensing events'. Together they form a unique fingerprint.Projects
- 2 Finished
-
Astrophysics in St Andrews: Astrophysics in St Andrews / SUPA (Continuan of Rolling Grant - XPP089
Bonnell, I. A. (PI), Cameron, A. C. (CoI), Dominik, M. (CoI), Driver, S. P. (CoI), Greaves, J. S. (CoI), Horne, K. D. (CoI), Jardine, M. M. (CoI), Wood, K. (CoI) & Zhao, H. (CoI)
Science & Technology Facilities Council
1/04/09 → 31/03/12
Project: Standard
-
Astrophysics at St Andrews: Astrophysics at St.Andrews
Cameron, A. C. (PI) & Horne, K. D. (CoI)
1/04/06 → 31/03/11
Project: Standard