Projects per year
Description
CCDC 1411098–1411113
Date made available | 2015 |
---|---|
Publisher | Cambridge Crystallographic Data Centre |
Projects
- 3 Finished
-
Impact Acceleration Account: Impact Acceleration Account
Woollins, J. D. (PI)
1/10/15 → 31/03/17
Project: Standard
-
Structuring the Future: Structuring the Future - Underpinning world-leading science in EaStCHEM through cutting edge characterisation
Woollins, J. D. (PI), Ashbrook, S. E. (CoI), Morris, R. E. (CoI) & Slawin, A. M. Z. (CoI)
1/01/13 → 31/03/13
Project: Standard
-
Upgrade Small Equipment Base: Small items of research equipment at the University of St Andrews. Supporting a new generation of physical sciences research
Woollins, J. D. (PI)
1/11/12 → 31/03/13
Project: Standard
Research output
- 1 Article
-
Intramolecularly group 15 stabilized aryltellurenyl halides and triflates
Do, T. G., Hupf, E., Nordheider, A., Lork, E., Slawin, A. M. Z., Makarov, S. G., Ketkov, S. Y., Mebs, S., Woollins, J. D. & Beckman, J., 9 Nov 2015, In: Organometallics. 34, 21, p. 5341–5360Research output: Contribution to journal › Article › peer-review
Open AccessFile22 Citations (Scopus)4 Downloads (Pure)