Projects per year
Date made available | 2014 |
---|---|
Publisher | Cambridge Crystallographic Data Centre |
Projects
- 3 Finished
-
Impact Acceleration Account: Impact Acceleration Account
O'Hagan, D. (PI)
1/02/13 → 31/10/14
Project: Standard
-
Structuring the Future: Structuring the Future - Underpinning world-leading science in EaStCHEM through cutting edge characterisation
Woollins, J. D. (PI), Ashbrook, S. E. (CoI), Morris, R. E. (CoI) & Slawin, A. M. Z. (CoI)
1/01/13 → 31/03/13
Project: Standard
-
Upgrade Small Equipment Base: Small items of research equipment at the University of St Andrews. Supporting a new generation of physical sciences research
Woollins, J. D. (PI)
1/11/12 → 31/03/13
Project: Standard
Research output
- 1 Article
-
Conformational dependence of through-space tellurium-tellurium spin-spin coupling in peri-substituted bis(tellurides)
Knight, F. R., Diamond, L., Athukorala Arachchige, K. S., Sanz Camacho, P., Randall, R. A. M., Ashbrook, S. E., Buehl, M., Slawin, A. M. Z. & Woollins, J. D., 16 Feb 2015, In: Chemistry - A European Journal. 21, 9, p. 3613-3627Research output: Contribution to journal › Article › peer-review
Open AccessFile